Back to Resource Center
Trade Classifications

Louisville Colorado Contractor License Classes and Supervisor Rules

Updated November 21, 2026
•The Licensing Company

Louisville, Colorado ties each contractor license to a 2018 or newer ICC exam or a Colorado master license, and to a full time supervisor who must be replaced within 30 working days.

Louisville, Colorado requires a City of Louisville contractor license before a contractor can be listed on a building permit, and since Ordinance 1895 of 2025 that license rests on a 2018 or newer ICC exam, or a Colorado master license for the electrical and plumbing trades. For the statewide rules, start with our Colorado contractor license guide; this page covers what Louisville adds on top, including its strict rule on the supervisor who qualifies the license.

At a glance

  • Who needs it: anyone paid to do work that requires a Louisville building permit, other than a homeowner working on a primary residence they live in (LMC 5.12.010)
  • Exams: ICC G11, G12 and G13 for general Classes A, B and C; ICC G31 Journeyman Mechanical for mechanical; 2018 edition or later
  • Trades: plumbing, electrical and solar contractors show a Colorado master license instead of an ICC result
  • Supervisor rule: the named supervisor must stay employed full time; notify the city within 3 working days if they leave and replace them within 30 working days (LMC 5.12.060)
  • Other cities' licenses: Louisville does not honor another jurisdiction's license in place of its own

Louisville sits in Boulder County between Boulder and Broomfield, and each of those three governments licenses contractors separately. The rules below come from the city's contractor licensing pages, the adopted text of Ordinance No. 1895, Series 2025, and the Chief Building Official's policy on expired licenses and renewals (revised May 12, 2026), all read on November 21, 2026.

Who Needs a Louisville Contractor License

Under Louisville Municipal Code Section 5.12.090, a contractor employed on a building project must be licensed with the City of Louisville and listed on the building permit. The city's online guidance puts it simply: you need the city license before you can be listed on a permit.

Ordinance 1895 rewrote the definition of contractor in Section 5.12.010.C. A contractor is any person or entity that, for any kind of compensation other than actual wages paid by a licensed contractor, undertakes, offers to undertake or claims the ability to undertake any work requiring a building permit. Two consequences follow:

  1. Employees are not separate contractors. A worker paid wages by a licensed contractor does not need a license of their own.
  2. Homeowners have a narrow exemption. Homeowners residing onsite and doing work on their personal, primary residence are not contractors and do not need a license. A landlord working on a tenant occupied property, or an owner hiring unlicensed help, does not fit that wording.

Louisville License Classes

The classification table in Section 5.12.070, as amended in 2025, ties each class to a specific credential and scope.

ClassCredential requiredWork allowed
A, General Building, commercial and multifamilyICC National Standard Building Contractor A (G11)Unlimited construction
B, General Building, commercial and multifamilyICC National Standard Building Contractor B (G12)Limited commercial, including new buildings and additions under 5,000 sq. ft. and all tenant finishes; unlimited residential
C, General Building, residentialICC National Standard Building Contractor C (G13)Residential one and two family new construction, remodeling and additions
DGeneral liability insurance onlyAll other contractors, including excavating, decks, pergolas, fences, roofing, windows, siding, insulation, energy raters, concrete, masonry, elevators and signs

The trade classes follow the same table.

Trade classCredential requiredWork allowed
PlumbingColorado master plumbing licenseUnlimited plumbing and gas piping installation
MechanicalICC Journeyman Mechanical (G31)Unlimited mechanical installation, including water heater replacement
Plumbing and MechanicalColorado master plumbing license plus ICC G31Plumbing, gas piping and mechanical installation
SolarColorado master electrical licenseSolar installation and repair
ElectricalColorado master electrical licenseUnlimited electrical

Every class must maintain general liability insurance. The city's license page also lists a combined Electrical, Mechanical and Plumbing license that requires both master licenses and the mechanical exam.

Exams Louisville Accepts

Ordinance 1895 moved the exam floor from the 2000 codes to the 2018 edition or later of the International Code Council exams. Louisville states that it accepts testing documents only from the ICC and the Colorado Department of Regulatory Agencies (DORA), and the Section 5.12.070 preamble says the city has no agreements to honor licenses issued by other jurisdictions. A license from Boulder, Denver or Broomfield does not stand in for a Louisville license.

Mechanical contractors get extra detail in the city's mechanical license handout:

  1. G31 is the minimum. Every mechanical contractor needs at least the G31 Mechanical Journeyman ICC test.
  2. F29 alone is not enough. A contractor who holds only the F29, or any ICC test other than the F29 or G29, must also take the G31.
  3. G29 counts. A G29 holder, the master level of the G series, does not need the G31.
  4. Mechanical tests are in person. Schedule through Pearson VUE under the ICC program at 1 (877) 234 6082.

The renewal policy adds a practical warning: ICC results must conform to the current Municipal Code, and the city's expiration reminders note that a new test may be required. A contractor licensed years ago on an older exam should check before the license lapses.

The Supervisor Rule

This is the part of Louisville's code most contractors underestimate. Sections 5.12.050 and 5.12.060, as amended in 2025, build the license around one named person.

The supervisor is named on the license. The person who passed the ICC exam is specified on the license as the supervisor. The license is specific to that supervisor and cannot be transferred to another person. General Class A, B and C licenses are not transferable either.

The supervisor must be an employee. When the licensee is not an individual, it must have in its employ a supervisor who holds the qualifications for that license. The license is valid only as long as the named supervisor remains in the licensee's employ in an "active, full-time capacity," meaning available at the company's local office, at home or at the job site within a reasonable time.

The supervisor must actually supervise. The code requires the supervisor to actively supervise the licensee's workers, take an active role in reviewing all work and materials, and be on the job site during scheduled inspections if the city asks.

The clock when a supervisor leaves:

EventDeadlineConsequence of missing it
Supervisor leaves the companyNotify the city within 3 working daysCause for suspension or revocation
Replacement supervisorObtain one within 30 working daysLicense deemed suspended until a supervisor is obtained and the city notified

The licensing policy reinforces the point from the portal side. Every license holder except Class D must have their own login to the city's Customer Self Service (CSS) portal using their direct email and phone number, separate from any office login. The city's page states that the person who holds the ICC certification or master license must create their own account.

How to Apply

Louisville runs licensing through its Customer Self Service portal, the same system used for permits.

  1. Confirm your class. Match your work to the class tables above and gather the matching ICC result or Colorado master license.
  2. Have the qualified person create the account. The ICC certificate holder or master license holder creates their own CSS account with their own email and phone number.
  3. Complete the application and upload documents. For ICC classes, the policy calls for a copy of the official test results page from ICCsafe.org that includes the test taker's photo. Electrical and plumbing contractors upload current state issued licenses for both the individual and the company.
  4. Pay the fee. The city states that applications are not reviewed until payment has been made.
  5. Wait for review. The city says most applications are reviewed the same day or the next business day.

Louisville's licensing pages do not print the license fee itself; it is set in the fee schedule the City Council adopts by resolution and is shown when you pay in the portal. Insurance works the same way. Since 2025 the city does not require proof of general liability insurance at application, but by signing you attest that you and your subcontractors will carry the types and amounts the Council sets by resolution, and the city may ask for proof at any time during the license term.

If an application is not compliant, the policy gives the applicant 30 days to fix it. After that the license is voided and the fees refunded.

When a License Expires

The Chief Building Official's policy, dated November 17, 2025 and revised May 12, 2026, spells out what happens to permits when a license lapses.

  1. Reminders go out first. The city emails the license contact 30, 20, 14 and 7 days before expiration and on the day it expires.
  2. New permits stop. New permits are held and not issued until the license is compliant.
  3. Open permits get 5 business days. Contacts on open permits are emailed, and if the contractor does not respond within 5 business days, the permits go on hold with no work and no inspections.
  4. A pending test buys time. A contractor who needs a new ICC test must show a paid receipt within 5 business days of expiration, with a test date within 30 days of expiration unless the Building Official approves otherwise. Work on open permits can continue up to the test date.
  5. Passing results are due fast. Results must be provided no later than 1 business day after passing, or the permits go back on hold.

The Chief Building Official may extend these deadlines for open permits.

Enforcement Added in 2025

Ordinance 1895 also gave inspectors more tools:

  1. Proof of state license at inspection. Contractors who need a state license must carry a copy during scheduled inspections and show it on request. Failing to do so is a failed inspection and a reinspection fee.
  2. Stop work orders. The building official may stop work for any violation of the chapter until all licenses, permits, inspections and proof of insurance are in place, and the city may charge a fee for working without a permit.
  3. Hearings. The building official may, and on a verified written complaint must, call a licensee before the building code board of appeals on at least five days' written notice to consider suspension or revocation.

Ordinance 1895 passed on second reading on May 20, 2025. The city's license page notes that it had not yet been incorporated into the online Municipal Code, so read the ordinance itself rather than an older code printout.

Qualifying a Louisville License Without an In House Supervisor

Louisville's code leaves no room for a name on paper. The supervisor must be employed full time, must supervise the work, and must be replaced within 30 working days if they leave. For a growing builder or trade company that does not yet have an ICC certified or master licensed person on staff, that is the hardest requirement on the list.

Marshall Schofield and Jeremiah Jaskulski built The Licensing Company around that gap. We place a qualifying agent with the company as a full time W-2 employee who holds the required credential and supervises the work, which is exactly the relationship Louisville's Section 5.12.060 describes. Read what a qualifying agent is, see how to hire a qualifying agent, or compare the supervisor rules of other Colorado cities in our guide to who can qualify a contractor license in Colorado.

Louisville's neighbors handle the same question differently. Our Boulder contractor license guide, Broomfield contractor license guide and Longmont contractor license guide cover the nearest programs, and HVAC companies can compare Louisville's G31 rule with other jurisdictions in our Colorado HVAC license guide.

Louisville Contractor License FAQs

Do I need a Louisville contractor license for a small job?

If the job requires a building permit and you are paid for it, yes. The definition turns on whether the work needs a permit, not on the size of the contract. Class D covers trades such as roofing, fences, decks and windows with no exam.

Will Louisville accept my Boulder or Denver license?

No. Louisville's code states it has no agreements to honor other jurisdictions' licenses, and the city accepts testing documents only from the ICC and DORA. You can use your ICC result or Colorado master license to apply for a Louisville license.

Which ICC exam do I need for a Louisville mechanical license?

At minimum the G31 Journeyman Mechanical, 2018 edition or later. A G29 holder does not need the G31, but an F29 holder does.

What happens if my supervisor quits?

Notify the city within 3 working days and get a qualified replacement within 30 working days. If you miss the 30 day window, the license is suspended until a new supervisor is in place and the city is notified.

Can a homeowner pull a permit without a license?

Yes, if they live in the home and are working on their own primary residence. Anyone they pay to do permitted work must be licensed.

How much does it cost to keep a qualified supervisor on staff?

It depends on the class, the credential level, your work volume and whether you hire directly or work with a placement firm. A qualifying agent placed by The Licensing Company is a full time W-2 employee, so the cost reflects a real hire. See how to hire a qualifying agent to talk through the factors.

Sources

All sources were read November 21, 2026.

  1. City of Louisville: Get a contractor license
  2. City of Louisville: Contractor licensing
  3. Ordinance No. 1895, Series 2025, Contractor Licensing
  4. Contractor Licensing Policy and Procedure Statement, revised May 12, 2026
  5. Louisville mechanical license information
  6. Pearson VUE ICC testing
Share:

Disclaimer: This article is provided for educational and informational purposes only. It does not constitute legal advice, licensing guidance, or an offer of services. Licensing requirements vary by jurisdiction. For specific compliance questions, contact The Licensing Company for a confidential consultation.

Tell us the state and the trade. A member of the team calls you back.

We confirm what your board requires for your situation, then match a licensed qualifier who joins your company as a full time W-2 employee. Rather talk now? Call 615-219-2110.

Tell us your state and trade

A member of the team calls you back from 615-219-2110.

We use your details only to reach you about your license.

Never Miss a Licensing Update

Stay ahead of licensing changes. Get contractor licensing news, enforcement alerts, and expert tips delivered to your inbox.